Following some photos on the progress of our house renovation.
Wall between kitchen - bathroom - bedroom : Demolished
See the floor without tiles, that's the original bath area of the washroom. While the other row of dis-tile floor is the original wall dividing the kitchen - bath area and room. We will have our dining table and an island here.
All 3 bathrooms at 1st floor - tiles were removed so that better water proofing can be done to avoid leaking in the future.
Above: all the toilet bowls and wash basin from the toilets seating in my living room.
We relocate the window at Room 2 and 3. So we will have another feet in the room.
All this ugly piping will be conceal within plaster ceiling.
We are expecting some electrical work to be done this week.. If, we are lucky the piping from the toilet will be replace by the developer so that we can continue with our renovation without much delay.
Although we have decided to accept whatever defect by fixing it ourself, this piping thing is too much a work and will have costs us a bomb to fix it. Hence, we are asking the developer to fix it. But they are taking their own sweet time to come :(
Although we have decided to accept whatever defect by fixing it ourself, this piping thing is too much a work and will have costs us a bomb to fix it. Hence, we are asking the developer to fix it. But they are taking their own sweet time to come :(
No comments:
Post a Comment