Monday, November 30, 2009

Renovation: Week 3

Progress in week 3 is SLOWwwwwwww and the reason being the developer is taking his own sweet time to rectify the defects. After 2 weeks of waiting they fixed one of the major plumbing defects. We would not wait for the developer for the other defect, decided to asked the contractor to repair it.


Can you see the buble? 
The piping is stuck and the water from toilet sink overflow to this manhole!



The stairs used by the worker - we used it to reach the attic... hehehehe
 I was a bit scared when Hubby asked me to climb up even Angel is much more brave then I am.

 

Hubby can't stand straight on the attic while my head will touches the ceiling if I stand straight.
For Angel, no problem! She is enjoying herself cause she got to climb up the stairs.

 

See the re-position window? 
We got an extra 1.5 feet. We asked for a cement slab to be built and to be turn into a window-seat cum cabinet.
All 3 rooms will have it.

 


Ohh, and when we were at the attic, we found another problem.....

Picture below is just outside the attic window and its where the water tank sits. Can you see the reflection? There is water on the pavement! I was telling Hubby that if this water can't disperse fast enough and with the current raining season, we will have a very big aquarium on our roof!!!



Does any of you have such problem with your house? I wonder what was the engineer and architect thinking. This people just don't care about other thing else but their profit margin. Hubby have posted his comment on our neighbourhood forum. Hopefully we can figure something to solve the problem.

No comments:

Post a Comment